In addition to the high qualified manpower and the super qualify engineers existing in our administration, technical office presented in Alexandria, Cairo and in Birmingham - U.K.,
also the qualified supervisors and technicians.
The following activities and equipment support the company to maintain high performance of the project:
|
1.HEAVY EQUIPMENTS: |
QUANTITIES |
|
- |
Telescopic Crane 80 Ton Capacity |
(No. 1). |
- |
Telescopic Crane 50 Ton Capacity |
(No. 1). |
- |
Rough Train Cranes 20 Ton Capacity |
(No. 2). |
- |
Diesel Generator 100 KVA Capacity |
(No. 2). |
- |
Diesel Generator 200 KVA Capacity |
(No. 1). |
- |
Diesel Generator 275 KVA Capacity |
(No. 1). |
- |
AIR Compressor (Diesel Eng.) |
(No. 3). |
- |
Trucks 30 Ton |
(No. 2). |
- |
Truck and Tractor 15 Ton Capacity |
(No. 1). |
- |
Excavator CAT |
(No. 1). |
- |
Loader CAT 2 m3 |
(No. 1). |
- |
Concrete Mixer ¼ , ½ , 1 m3 Capacity |
(No. 6). |
- |
Concrete Vibrators |
(No. 12). |
- |
Electrical Bar Cutting and Bender M/C |
(No. 2). |
- |
Fork lift 3 Ton |
(No. 2). |
- |
Fork lift 5 Ton |
(No. 1). |
- |
Elect. Wooden Saw Table for Shuttering |
(No. 5). |
- |
Metal Frames for Concrete Shuttering Supports |
2500 m2 |
- |
Wood Mosq and Other Sections for Shuttering Supports |
75 m3 |
- |
Level instrument and tedulet |
(No. 4). |
- |
Caravan Office for site mobilization facility |
(No. 25). |
- |
Store Containers Furnished with Shelves |
(No. 18). |
- |
Furnished Mobile Work Shop (Welding M/C & Carpenter Tools) |
(No. 3). |
- |
Scaffolding Pipes and Frames Complete With Clips |
1200 m2 |
- |
Lifting Equipment |
Lot |
- |
Safety Equipment and Materials |
Lot |
- |
Welding M/C 250 - 400 Amp. |
(No. 25). |
- |
Pick-up Cars |
(No. 3). |
|
|
|